Touch time
The hours somebody was actually working on a vehicle, as opposed to the days it spent in the building.
A repair with 20 hours of work that takes 10 days has 20 hours of touch time and 10 days of cycle time. The gap between them is the shop’s real problem, and it is almost always waiting rather than working.
Comparing the two is the most useful diagnostic an owner has: it points at scheduling, parts and approvals rather than at technicians.
Related terms
- Cycle time — How long a job takes from the customer handing the keys over to getting them back — including every day nothing happened.
- Throughput — How much work the shop completes in a period — vehicles out of the door, or hours billed.
- Technician efficiency — Hours billed divided by hours worked — whether a technician beats the published times.
- Apprenticeship — Bringing somebody into the trade through structured on-the-job training rather than hiring a finished technician.
- Average repair order — Total revenue divided by the number of jobs — what the average customer spends on a visit.
- Bay — One working space in a shop, usually with a lift, and the unit a shop’s capacity is counted in.