Technician efficiency
Hours billed divided by hours worked — whether a technician beats the published times.
Efficiency compares flagged hours against clocked hours. Above 100% the technician is beating book time; below it they are losing to it.
It is distorted by everything outside the technician’s control — waiting for parts, redoing somebody else’s work, diagnosing a hard fault — which is why it is read alongside productivity rather than alone, and why it is a poor stick to beat people with.
Related terms
- Book time — The labour time a published guide allows for an operation on a specific vehicle.
- Flat rate — Paying a technician the guide time for a job rather than the hours they actually spent on it.
- Touch time — The hours somebody was actually working on a vehicle, as opposed to the days it spent in the building.
- Effective labour rate — Labour revenue divided by hours billed — what the shop actually collects per hour, as opposed to what it posts.
- Apprenticeship — Bringing somebody into the trade through structured on-the-job training rather than hiring a finished technician.
- Average repair order — Total revenue divided by the number of jobs — what the average customer spends on a visit.
