Shop operations

Bay utilisation

How much of the available bay time is actually producing billable work.

A bay holding a car that is waiting for a part, an approval or a decision is occupied and unproductive. Utilisation makes that visible as a number rather than as a feeling that the shop is full.

It is the measure that usually shows an owner they do not need more space, they need fewer waits.

Related terms

  • Bay — One working space in a shop, usually with a lift, and the unit a shop’s capacity is counted in.
  • Capacity — The most work a shop could do in a period if nothing were waiting — set by its bays, its people and its equipment.
  • Throughput — How much work the shop completes in a period — vehicles out of the door, or hours billed.
  • Cycle time — How long a job takes from the customer handing the keys over to getting them back — including every day nothing happened.
  • WIP — Every job currently open in the shop — started, not delivered — and the money tied up in them.
  • Apprenticeship — Bringing somebody into the trade through structured on-the-job training rather than hiring a finished technician.

Run the job, not the paperwork.