Throughput
How much work the shop completes in a period — vehicles out of the door, or hours billed.
Throughput is the output of the building. It is limited by whichever resource runs out first — bays, technicians, paint booth time, the estimator’s day — and raising anything other than that constraint changes nothing.
Shops typically discover that their constraint is not the thing they were about to spend money on.
Related terms
- Capacity — The most work a shop could do in a period if nothing were waiting — set by its bays, its people and its equipment.
- Cycle time — How long a job takes from the customer handing the keys over to getting them back — including every day nothing happened.
- Car count — How many vehicles the shop worked on in a period — the volume half of the revenue equation.
- WIP — Every job currently open in the shop — started, not delivered — and the money tied up in them.
- Apprenticeship — Bringing somebody into the trade through structured on-the-job training rather than hiring a finished technician.
- Average repair order — Total revenue divided by the number of jobs — what the average customer spends on a visit.
