Parts and production

How to run a production meeting

Fifteen minutes, every open job, one question each: what is it waiting for and who owns that. Not a status report.

Reviewed

The production meeting exists to surface the jobs that have stopped. Most of a shop’s cycle time is jobs nobody looked at for three days, and a short daily review is the cheapest fix available.

It stops working the moment it becomes everyone reporting what they are doing.

Step by step

  1. Hold it at the same time every day

    Short, standing up, in front of the board. A meeting that moves gets skipped.

  2. Walk every open job, fast

    Jobs that are moving get five seconds. The purpose is to find the ones that are not.

  3. For each stalled job ask one question

    What is it waiting for. Not a summary of the work — the single thing blocking it.

  4. Name an owner and a date

    Every blocker gets a person and a day. A blocker owned by everyone is owned by no one.

  5. Check promised delivery dates

    Which jobs will miss, and who is telling the customer today rather than on the day.

  6. End it

    Fifteen minutes. Anything that needs longer is a conversation for two people, not for the room.

Terms on this page

  • Production meeting — A short daily review of every open job — where it is, what it is waiting on, and whether it will deliver when promised.
  • WIP — Every job currently open in the shop — started, not delivered — and the money tied up in them.
  • Cycle time — How long a job takes from the customer handing the keys over to getting them back — including every day nothing happened.
  • Pipeline — The ordered list of steps a job moves through in a particular kind of shop, and the board that shows every job in its current step.
  • Backorder — A part the supplier cannot ship because it is out of stock, with no firm date for when it will be.

Run the job, not the paperwork.

From $149 a month, flat, for your whole team.

Get started