How to keep a production board honest
Boards die when the steps do not match the work. Use the steps your shop actually has, make updating faster than not, and never keep two boards.
Reviewed
Every shop has had a board that nobody updated. It usually failed for one of two reasons: the steps described somebody else’s shop, or updating it was slower than shouting across the workshop.
An inaccurate board is worse than none, because decisions get made from it.
Step by step
Use the steps your trade actually has
A tow company’s steps are dispatch and storage. A glass shop’s include calibration. A wrap shop’s include proofs and printing. A generic repair pipeline fits none of them.
Keep the number of steps small
Enough to show where a job is, few enough that moving one is obvious. Twenty steps means nobody can remember which one applies.
Make updating a single action
One tap from where the person already is. Anything requiring a trip to an office will be done at the end of the day, from memory, or not at all.
Let the people doing the work update it
A board maintained by one administrator from hearsay is a transcription exercise with a delay built in.
Have exactly one board
A whiteboard plus a system means two truths and an argument. Pick one.
Use it in the daily meeting
A board that decisions are made from gets maintained. A board nobody looks at does not.
Terms on this page
- Pipeline — The ordered list of steps a job moves through in a particular kind of shop, and the board that shows every job in its current step.
- WIP — Every job currently open in the shop — started, not delivered — and the money tied up in them.
- Production meeting — A short daily review of every open job — where it is, what it is waiting on, and whether it will deliver when promised.
- Cycle time — How long a job takes from the customer handing the keys over to getting them back — including every day nothing happened.
- Technician assignment — Attaching a named technician to a job, so the work, the hours and the questions have an owner.