Running the shop

How to calculate your shop’s break-even

Add up what the building costs whether or not a car comes in, divide by your gross margin, and you have the number you must clear every month.

Reviewed

Break-even is the simplest useful number an owner can have, and most do not have it. It is what the business must produce before anything is profit.

Knowing it changes decisions: whether a programme rate is viable, whether a quiet week is a problem, and what a new hire actually has to produce.

Step by step

  1. List the fixed costs

    Rent, insurance, equipment finance, software, utilities, loans, salaried staff and the owner’s own pay. Everything the building costs with no work in it.

  2. Work out your gross margin as a percentage

    Revenue less parts, sublet and the direct labour that produced it, divided by revenue. Per department if the departments differ.

  3. Divide fixed costs by the margin

    That is the revenue you must produce each month to break even. It is usually larger than people expect.

  4. Convert it into something countable

    Produced hours per week, or cars per week at your average order. A number you can see on a board beats one in a spreadsheet.

  5. Test decisions against it

    A new technician, a second bay, a programme at a lower rate — each changes either the fixed cost or the margin, and the break-even moves.

  6. Recalculate when something changes

    A rent review, an equipment purchase or a pay rise all move it, and the old number quietly stops being true.

Terms on this page

  • Gross profit — What is left of a job after the cost of its parts, sublet and the labour that performed it.
  • Effective labour rate — Labour revenue divided by hours billed — what the shop actually collects per hour, as opposed to what it posts.
  • Average repair order — Total revenue divided by the number of jobs — what the average customer spends on a visit.
  • Car count — How many vehicles the shop worked on in a period — the volume half of the revenue equation.
  • Capacity — The most work a shop could do in a period if nothing were waiting — set by its bays, its people and its equipment.

Run the job, not the paperwork.

From $149 a month, flat, for your whole team.

Get started