How to work out what a job really cost
Take the revenue, subtract the parts at what you paid, the sublet, the hours at their real cost, and everything absorbed. Then look at the number.
Reviewed
Shops are usually confident about busy and unsure about profitable. Job-level costing is the only way to find out which kinds of work pay and which are subsidised by the rest.
The number people miss is almost always the absorbed one: a short pay nobody recorded, a sublet invoice that arrived late, a core never returned.
Step by step
Start from what you were actually paid
Not what you invoiced. The difference is short pays, discounts and write-offs, and that difference is the point of the exercise.
Subtract parts at cost, not at the billed price
Including anything returned without credit and any core deposit not recovered.
Subtract every sublet invoice
Including the ones that arrived after the job closed, which is where the error usually is.
Subtract labour at its real cost
Technician cost including benefits and payroll taxes, for the hours actually spent, not the hours flagged.
Subtract materials properly
On a refinish job the materials actually mixed, not the allowance billed. The gap between them is the finding.
Compare across kinds of work
Insurance against customer-pay; one shop type’s work against another’s; large jobs against small. The pattern is more useful than any single job.
Act on the pattern, not the outlier
One bad job is noise. A category that consistently loses money is a pricing or a selection decision.
Terms on this page
- Gross profit — What is left of a job after the cost of its parts, sublet and the labour that performed it.
- Effective labour rate — Labour revenue divided by hours billed — what the shop actually collects per hour, as opposed to what it posts.
- Short pay — An insurer paying less than the estimate, by removing lines, cutting times or paying for a cheaper part than the one used.
- Sublet — Work sent to another business and billed through the shop’s own invoice — calibration, alignment, glass, upholstery, machining.
- Core charge — A deposit on a rebuildable part, refunded when the old unit is returned to the supplier.
- Paint and materials — The consumables used in refinishing — colour, clear, primer, hardener, masking, abrasives — billed either per refinish hour or from an itemised list.