Line item
One operation on an estimate: what is being done, to what, with how much labour and which part.
Everything on an estimate is a line, and a line is the unit a reviewer argues with. A clear line names the part, the operation, the time and the part type, and anything that makes it unusual is noted on it rather than assumed.
Estimates lose money one line at a time. The lines that survive review are the ones that explain themselves.
Related terms
- Estimate — A written, itemised forecast of what a repair will cost — parts, labour, paint and sublet — priced line by line before the work starts.
- Supplement — An addition to an existing estimate, written when damage or work is found that the original estimate did not cover.
- Included operation — Work that a labour guide treats as already paid for inside another operation’s time, so billing it separately is a duplicate.
- Not-included operation — Necessary work that a labour guide explicitly does not cover in any published time, so it has to be added as its own line.
- Alignment — Setting a vehicle’s suspension angles — camber, caster and toe — back to the manufacturer’s specification.
- Appearance allowance — A cash payment to the vehicle owner instead of a repair, where the damage is cosmetic and they agree to accept it as it is.
